Learn
How to price a freelance fee before you hit send
Turn Upwork's 0% to 15% freelancer fee into a client rate. The percentage on the proposal is the one that counts. Basic is $0. Plus is $19.99.
Verdict. Bill enough that Upwork's fee still leaves what you need to keep. Use the percentage on the proposal, inside the published 0% to 15% range.
| Option | What to know |
|---|---|
| Fee on the proposal | The percentage that counts. The help article uses 10% as an example. The pricing page's range is 0% to 15%. |
| Basic and Plus | Basic is $0. Plus is $19.99 a month. Add $0.15 for Connects you had to buy if you bought them for this proposal. |
The fee is a percentage of what the client pays. If you set your rate as the amount you want to keep, you will keep less. This worksheet uses Upwork’s published range, read November 18, 2026. We did not submit a proposal. The narrative version is on We Tried That. The shortlist is first tools for a freelancer.
The inputs
Write four numbers before you open a proposal.
Target: what must land in your account for the work to be worth it. Example: $500.
Fee: unknown until the proposal shows it. The allowed band on the pricing page is 0% to 15%. Do not fill this in from memory.
Connects: $0.15 each if you buy them. Basic can earn up to 10 a month by tasks and otherwise shows zero included. Plus includes 100 and costs $19.99 a month.
Plus: $0 if you stay on Basic. $19.99 if this proposal is why you would subscribe.
The arithmetic
Client bill = target / (1 - fee). At 0%, a $500 target bills $500. At 10%, it bills $555.56, which is the shape of Upwork’s own hourly examples. At 15%, it bills $588.24. Round up a dollar. The help article shows that hourly math can be off by cents after rounding. A dollar of padding survives cents. It does not survive a fee you misread. If the proposal says 8%, recompute. 500 / 0.92 is $543.48. Send that, not the 15% number you rehearsed.
Then add Connects and Plus if they exist only because of this proposal. Twenty Connects are $3. Plus is $19.99. A $500 target at 15% with Plus bought for this job is not $588.24 of value to you. You still bill about $588.24 to net $500 before Plus, and Plus takes $19.99 of that month. If you will send many proposals, do not load all of Plus onto one project. If you will send one, load it, and decide if the project still works.
Direct Contracts are a different row: 5% on Basic and 0% on Plus in the table we read, for clients you bring. A marketplace stranger is not that row. Any Hire is described as no freelancer fee. Enterprise is often 10% and can differ. If you are not sure which row you are in, you are in the ordinary range until the screen says otherwise.
The send rule
Do not send the proposal while the fee field is blank. Do not send it if the client rate is one you would not say on a call. The fee did not ruin a good project in that case. The project could not pay you and the platform. Joining is free. Free to join is not a reason to propose.
After payment, open the transaction report. Upwork says the fee is itemized there and that it may be tax-deductible. The itemized line is a fact you can check. The deduction is a question for a preparer. If the report’s percentage is not the locked percentage, keep the screenshot. That is a real correction. A two-cent rounding gap is the example the help article already gave.
What this is not
It is not a survey payout and not a driving rate. Those do not use this formula. It is not a promise you will be hired. It is not the old lifetime-earnings ladder, which these pages did not describe.
Four proposals, four different bills
Proposal A is a logo. You want $300 kept. The screen says 20%. Stop. The pricing page’s range is 0% to 15%. A number outside the range means you are not looking at the fee this guide describes, or the page has changed. Do not send $300. Re-read the field. If it really is above 15%, the formula still works, but this article’s band is stale and you should trust the screen and tell us.
Proposal B is a landing page. You want $800 kept. The screen says 10%. Bill 800 divided by 0.9, which is $888.89, and round to $890. The help article’s rounding examples are why the extra dollar exists. You did not buy Connects. You are on Basic. The month’s extra cost is $0. Say $890 to the client.
Proposal C is the same landing page, but you bought 40 Connects at $0.15, which is $6, and you subscribed to Plus at $19.99 because you thought it looked serious. The fee on the screen is still 10%. The client bill is still about $890 if the target kept is $800. Plus and Connects are your costs, not the client’s fee percentage. If this is your only proposal, your real keep is $800 minus $25.99, about $774, unless you raise the target and recompute. If you will send ten proposals this month, do not subtract the whole $19.99 from this one project in your head while also subtracting it from the other nine. Pick one accounting treatment and stick to it. The transaction report will not do that thinking for you. It will show the service fee.
Proposal D is a client from your old job. The pricing table’s Direct Contracts row says 5% on Basic and 0% on Plus. You are on Basic, so you plan for 5% until the offer screen agrees. $800 kept at 5% is 800 divided by 0.95, about $842.11. If you move to Plus only for the 0% row, the client bill can be $800 and you pay $19.99 for the month. $19.99 is less than 5% of $800, which is $40, so Plus wins on this one invoice if the 0% row really applies. If the client was found on the marketplace, the row does not apply, and the 0% plan will not erase a marketplace fee. Read the word “bring.”
None of these proposals is a hire. The worksheet prices the fee. It does not conjure the client. Send proposal B or D only if the client rate is one you can defend. Leave A unsent until the percentage makes sense.
One more pass before send
Read the fee percentage out loud. Compute the bill. Add Connects and Plus only if this proposal caused them. If the bill is a number you would not say to the client, close the draft. Upwork’s range says you might keep $85 or $100 of each $100. There is no honorable way to keep $100 while the screen says 15%. The worksheet is finished when the bill, the fee, and the keep are the same story. Send that story or do not send it. A second proposal tomorrow uses the same three numbers, not a new fantasy rate.
Read the percentage, the bill, and the keep as one sentence you could paste into the proposal notes. If the sentence needs a footnote about Plus or Connects, the footnote is part of the sentence. Sending the proposal without that sentence is how the fee becomes a surprise in the report. The report is a check, not the moment you do the math. Do the math while the draft is still a draft.
Sources
Filing the contractor’s 1099 is a different bill from the fee on the proposal. Ways to file 1099s online compares the portals.
What formula should I use?
Client bill equals the amount you need to keep, divided by 1 minus the fee percentage on that proposal. At 15%, keeping $500 means billing about $588.24.
Is 10% my fee?
Only if the proposal says 10%. Upwork's help article uses 10% as an example. The pricing page's range is 0% to 15%.
Do Connects change the formula?
Add Connects you had to buy at $0.15, and add $19.99 if you subscribed to Plus only for this proposal. The percentage formula does not include them.
